 |

|
 |
 |
|
Fuselage Nose, and Centre Section aligned in jig.
|
Tailplane under construction, Fin and Rudder Completed
|
Formers, Longerons, and all spacers in position.
|
Forward Fuselage completed, prior to attaching top, and bottom longerons.
|
 |
 |
 |
 |
|
All fuselage basic structure completed, still clamped in jig.
|
All fuselage basic structure completed, still clamped in jig.
|
View showing .8mm ply covering, and cockpit detail added.
|
One main spar completed, other spar drying out between wooden batons.
|
 |
 |
 |
 |
Stbd Wing root, showing diagonal web supports and Air brake servo installation.
|
Stbd Wing structure aft of spar completed. Air brakes installed.
|
Initial mating of stbd wing to check rear wing joiner alignment.
|
Stbd wing root detail, nose ribs, and LIE sheeting secured. Rear wing joiner secured.
|
 |
 |
 |
 |
|
View showing, Tail unit in position, and stbd wing attached.
|
As above with nose ribs added, also canopy in position.
|
Wings clamped in position for symmetry check.
|
Structure complete less wing and nose sheeting..
|
 |
 |
 |
 |
|
Canopy frame, and Centre section sheeting added.
|
Tail unit covered, and fuselage covering in progress.
|
Fuselage fully covered with Solartex, less nose top decking.
|
Cockpit detail added, and glazing finished, pitot head installed.
|
 |
 |
 |
 |
|
Close up of port top air brake area, prior to covering top surface.
|
All complete, pilot strapped in, only nose to be covered.
|
Recent addition of EMS Battery Backer in cockpit.
|
Completed model at Warwick Racecourse for full range checks.
|
 |
 |
|
|
| Aug 1993 at Cliff Charlesworths Fly-in, at the White Sheet. |
July 1994 White Sheet Vintage Day. |
|
|