Page 3 of 9

Re: scratch built 7m ASH 31

Posted: 31 May 2019, 09:51
by roo Hawkins
Wing joiners set in this morning. 18mm steel and 20 mm carbon tube fixed in with epoxy and carbon mix this is to set it it the right place it well then be carbon and epoxy reinforced later.

Re: scratch built 7m ASH 31

Posted: 01 Jun 2019, 14:32
by roo Hawkins
Carbon web glassed ply carbon sandwich

Re: scratch built 7m ASH 31

Posted: 06 Jun 2019, 11:30
by roo Hawkins
Leading edge fixed on and carbon tape on top of spar done. Started the outer panels.

Re: scratch built 7m ASH 31

Posted: 06 Jun 2019, 17:03
by roo Hawkins
first rig up

Re: scratch built 7m ASH 31

Posted: 09 Jun 2019, 15:14
by roo Hawkins
Outer wing joiner made up out of steel tube and glass reinforced with carbon.

Re: scratch built 7m ASH 31

Posted: 10 Jul 2019, 15:53
by roo Hawkins
Carbon d box glassed with 100gm ud and bi carbon cloth.

Re: scratch built 7m ASH 31

Posted: 17 Jul 2019, 19:10
by roo Hawkins
Bottom veneer skin has been epoxied on and carbon T.E added.

Re: scratch built 7m ASH 31

Posted: 17 Jul 2019, 21:36
by roo Hawkins
More pictures

Re: scratch built 7m ASH 31

Posted: 18 Jul 2019, 23:44
by roo Hawkins
More pictures

Re: scratch built 7m ASH 31

Posted: 28 Jul 2019, 19:57
by roo Hawkins
Wings cut out for kevlar hinges