On the back of the wing section on the fuselage you will see a 'metal' panel. To create the rivets I used a syringe filled with PVA glue, preferably aliphatic (yellow) in case you need to sand any bad ones off and re-apply. On the end of the syringe I added a nozzle from a bottle of instant glue for a narrow exit and with light pressure on the plunger added dots of glue.
- Barry_Cole
- Posts: 1422
- Joined: 10 Mar 2015, 09:30
- Location: Hampshire UK
Re: Zephyrus from down under
Maybe we need some Insanity Police........
BC




BC
- VinceC
- Site Admin
- Posts: 793
- Joined: 22 Feb 2015, 11:45
- Contact:
Re: Zephyrus from down under
A long day screwing - no naughty thoughts guys
I fitted the top window and made and screwed down the alluminium retaining frames. The section around the wing root took a bit of working out, but finally got there. Now to repeat that on the other side.
The loop screws at the front of the canopy 'rear section' was yesterdays work
I fitted the top window and made and screwed down the alluminium retaining frames. The section around the wing root took a bit of working out, but finally got there. Now to repeat that on the other side.
The loop screws at the front of the canopy 'rear section' was yesterdays work
- B Sharp
- Posts: 796
- Joined: 19 Mar 2015, 17:18
- Location: Perthshire
Re: Zephyrus from down under
You've still got "it" Vince. I'm not sure what "it" is but its still there.
Most impressive.
Brian.
Most impressive.
Brian.

- VinceC
- Site Admin
- Posts: 793
- Joined: 22 Feb 2015, 11:45
- Contact:
Re: Zephyrus from down under
It could be catching Brian, see your Doctor
-
- Posts: 1
- Joined: 21 Mar 2015, 11:09
- Location: Melbourne Australia
Re: Zephyrus from down under
Looking good Vince.
- VinceC
- Site Admin
- Posts: 793
- Joined: 22 Feb 2015, 11:45
- Contact:
Re: Zephyrus from down under
Todays task was to complete the canopy frame. The front of the frame has to encircle the front instrument panel
- VinceC
- Site Admin
- Posts: 793
- Joined: 22 Feb 2015, 11:45
- Contact:
Re: Zephyrus from down under
Hinges for the frame made, frame secured, canopy added and fixed to the frame with 1.8mm self tapping screws through lithoplate (0.45mm alluminium) side frames, but still to be tidied up. I have used about 120 of these screws for all the glazing. At least the occupants can have a good look round
- VinceC
- Site Admin
- Posts: 793
- Joined: 22 Feb 2015, 11:45
- Contact:
Re: Zephyrus from down under
Whilst you were all on your knees at Church today, I finished the Struts. They are a composite build of Alluminium tube, Balsa and Carbon Fibre. My original idea was to glass them to get a smooth finish. but then decided to wrap 0.4mm ply around them and the results are very pleasing. Two options of finish are painting or vinyl wrap. I think I prefer the second.
I sprayed the wings white the other day, oh how I miss Solartex
I sprayed the wings white the other day, oh how I miss Solartex
- VinceC
- Site Admin
- Posts: 793
- Joined: 22 Feb 2015, 11:45
- Contact:
Re: Zephyrus from down under
Nearly finished. Just the odd few bits to complete. First up is the tail/fin fairing, built with a balsa core and covered with carbon fibre, then a wheel shroud from 1mm Aluminium cut on a fret saw.
Next up are two sliding vent windows to install